top of page

Checklist for the preparation of your land before house construction

  • coraliefortin076
  • Aug 1
  • 5 min read

Updated: Aug 21


prepare your land before construction Quebec
A plot of land

When we think about building a house, a cottage, or even a garage, our minds often turn to the architecture, the materials, and even the style of the building. However, even before laying the first stone, one crucial step deserves your full attention: site preparation. Too often underestimated, this phase is crucial to the success of any residential project.


At Plan Maison Québec, a recognized specialist in construction and renovation plan design across Canada, we know that a poorly prepared site can quickly turn your dream home into a nightmare. Unstable soil, drainage problems, and excavation errors are just some of the pitfalls that can be avoided with careful preparation.


This article offers a complete and detailed checklist to help you approach this stage with confidence, guiding you step by step through the decisions to make before starting your project.


Understanding the importance of ground preparation


Even before considering foundations, the strength of a building depends on the quality of the soil that supports it. Too often, future owners neglect this essential phase. An improperly assessed or prepared site can lead to cracks, subsidence, drainage problems, and unforeseen costs that compromise the project's sustainability.


At Plan Maison Québec, we insist on a rigorous approach from the outset. Working with soil and civil engineering experts, we help you determine the type of soil on your lot—whether clay, sandy, rocky, or mixed—and anticipate the technical challenges related to its composition. For example, clay, which is very common in certain regions of Quebec, has a high water-holding capacity and can expand or contract depending on the season, which has a direct impact on the foundations.


A thorough soil analysis can help avoid major disappointments, such as the unexpected need for blasting, or the discovery of shallow water tables that would compromise the installation of a basement.

stages of preparing land for new house in Quebec
Analyze a field

Stripping, excavation, and contingency management


Once the soil analysis is complete, the first physical intervention on the ground is stripping. This step involves removing the top layer of soil—often composed of black earth and vegetation—to access a more stable layer capable of supporting permanent structures.


Next comes excavation, a delicate step requiring great precision. The level of excavation depends on the type of construction planned, whether it's a slab-on-grade, a basement, or a detached garage. At this stage, it is essential to call on experienced professionals, as poorly planned excavation can lead to landslides, foundation instability, or water infiltration.


A common challenge in Quebec, particularly in mountainous or semi-rocky regions, is the presence of massive rocks. In some cases, the use of a hydraulic hammer is sufficient to fragment the rock blocks. However, when conditions require it, controlled blasting may become unavoidable. This involves administrative procedures, consultation with certified explosives experts, as well as notification of the neighborhood.

building land checks Quebec
House in the countryside

Plan Maison Québec always recommends a preventive approach: obtain several quotes from excavation contractors, anticipate contingency costs, and validate the proposed methods. Our specialized partners support you to secure each step and avoid unpleasant surprises.


The installation of controlled backfill and its structural role


Controlled backfill is much more than just soil filling. It is a mixture of sand or gravel compacted in successive layers, designed to provide a stable and uniform base on which to pour the foundation. This process is often used when the original soil lacks sufficient bearing capacity, or when a slope needs to be leveled.


Compaction is crucial. Without it, the ground can settle over time, creating structural problems, cracks in walls, or doors that don't close properly. Moisture can also seep in through capillary action. Therefore, controlled backfill is generally subjected to compaction tests conducted by an accredited laboratory, with reports submitted to the engineers and the municipality.


At Plan Maison Québec, we integrate all land constraints into our plans, including areas to be backfilled, final finished ground heights, and technical requirements to ensure compliance with current standards (Quebec Construction Code, municipal regulations, etc.).

land excavation house Quebec
Controlled backfill

Soil analysis: essential, but with limits


Conducting a soil analysis, also known as a geotechnical study, isn't just a precaution—it's a guarantee. It detects the presence of rocks, groundwater, organic or unstable soils, and guides foundation decisions.


The tests performed generally include penetrometer testing, grain size analysis, and moisture content verification. This study is required by many municipalities in Quebec before issuing a building permit.


However, even the best geotechnical study can't reveal the entire subsoil. Sampling is done on a limited portion, and different conditions may occur elsewhere on the site. That's why it's wise to build a safety margin into your budget to manage these eventualities.


Plan Maison Québec recommends that its clients never skip this step, even if it represents an initial cost. It reassures the structural engineer, protects investments, and optimizes construction time.

residential land soil study Quebec
Analysis

Anticipating major interventions: blasting vs. hydraulic hammer


site preparation services construction Quebec
Blasting

When a rock is blocking the progress of excavation, two options are generally available: hydraulic hammer, which mechanically strikes the rock to fragment it, or controlled blasting, which uses explosive charges to fracture the rock mass quickly.


The choice depends on several factors: the scale of the work, the density of the rock, the proximity of homes, the tolerable noise level, and municipal regulations. Blasting is faster but requires strict procedures, including seismic measurements, specific insurance, and administrative delays. The hydraulic hammer is slower but easier to implement.


At Plan Maison Québec, we collaborate with excavation experts to help you make the best decision for your situation. Our plans incorporate topographical data and foundation levels upfront, allowing us to identify sensitive areas and assess the feasibility of each solution.


Leave a financial margin for unforeseen events


A construction project, no matter how well prepared, always involves an element of unforeseen events. The discovery of an old well, contaminated soil, or complex drainage conditions can lead to last-minute adjustments.


This is why Plan Maison Québec advises all its clients to set aside a budgetary reserve representing between 10 and 15% of the total project cost. This margin allows for additional expenses to be covered without compromising the rest of the project or delaying the schedule.


It is also recommended to maintain a degree of flexibility in contracts with contractors to include adjustment clauses in the event of soil conditions differing from those initially anticipated.

drainage land construction house Quebec
Unforeseen events

Concrete steps to prepare your land effectively


Preparing your land for construction isn't just a matter of clearing the ground. It's a comprehensive process, governed by technical standards and municipal regulations. Here's how Plan Maison Québec structures the approach:


1 ) The field visit 


It allows us to carry out a topographic survey, assess natural obstacles (slope, trees, waterways), and identify buildable areas. Our experts then assist you in obtaining the necessary permits, including building permits, environmental authorizations, and staking and installation certificates.


2 ) Cleaning the site


It involves removing vegetation, debris, roots, and existing structures if necessary. The leveling and excavation stage is then carried out precisely according to the levels defined in the plans. Accuracy is essential here, as it determines the performance of drainage, rainwater management, and the accessibility of the future home.


3 ) Stabilizing treatment (lime, cement, geotextile)


It can be applied to improve load-bearing capacity. Drainage systems are also installed at this stage: French drains, catch basins, ditches, etc.


Throughout the process, Plan Maison Québec acts as a conductor, ensuring coordination between the various stakeholders—engineers, surveyors, excavation contractors—to ensure the work meets deadlines, standards, and budget.


Conclusion: land preparation for house construction in Quebec


In short, preparing your land before building a house in Quebec (house, cottage, garage) is a crucial step to avoid costly unforeseen events and ensure the stability of your construction. At Plan Maison Québec, we help you navigate geotechnical analyses, technical choices (blasting versus hydraulic hammer), planning, equipment, and environmental protection.


Don’t wait for unpleasant surprises!



 
 
 

Comments


Like you, we want to approach your project calmly and with certainty.

 

This is why the first discussions with our architectural technologists and construction estimators to validate the feasibility of the project and your budget are free and without obligation.

Our professionals will also be happy to offer you valuable advice and guide you according to the stage of progress of the project, even if plans are not necessary at the moment.

Ready to get started? Make an appointment online:

*No fees or commitment

(Meeting with a construction technologist and estimator with ZOOM)

fond-reservation-et-formualire.jpg

​© 2024 - All rights reserved.

  • Facebook
  • YouTube
  • LinkedIn
  • Pinterest
bottom of page